Agenda: Project Outline
The team met up today to do up our project outline. We had to do the project operation breakdown, synopsis, objectives of the project, methodology and team member allocation etc.
Scope of Work Covered:
a. Determine and collate ground-breaking eco-friendly methods that can be used in conferences
i. Paperless
ii. Bio-degradable materials used at events
iii. Food and catering - organic food
b. Procedure of organizing conferences
c. Survey of event organizers and delegates opinion on chosen eco-friendly concepts through 3 designated conferences
Methodology:
a. Job Scope of each team member
i.e. Co-relation/Task Breakdown of each member
b. Process of obtaining information
c. Tabulation and evaluation of survey results
d. Process of analyzing obtained information
e. Process of concluding analyzed information
Limitations and/or Challenges:
a. Predicated / Pre-mediated
i.Possible workarounds and/or solutions
b. Unforeseen Challenges and Limitations
ii.Turnover/recovery time for challenges faced
c. Limited sources in regards to certain green practices
Work Schedule:
Plan of general project outline based on
i. Project Objectives
ii. Manpower Allocation
iii. Project Deliverables
iv. Key Milestones to be met
Initially, the whole team decided to do the project outline together but it proved to be time consuming. After that, we separated our work so that it would be more efficient for the team.
We each completed our part of the project outline and Jesslyn compiled and vat the whole thing. This framework will help us to keep track of our progress on our project. Hopefully, with the help of this, we are able to be consistent and not lose track on the objectives of our project.
This project outline was send to Chronos for evaluation.